Seriously Dave you need to get your priorities sorted lolHave a good day on Saturday, yet again something else has got in the way of attending. Apparently it's expected that the grandfather should attend the christening of the first grandchild.
All fascinating stuff George! I’m intrigued by the bellcranks; from the photo they seem to pop up out of the top of the baseboard. Are they going to be hidden by the platform or a building or similar? Also the photo doesn’t show how the wires then link up to the points so a bit of explanation there would be interesting.So after a days work we've made some progress. Not as much as I would have liked but enough to give me confidence that we might just make it.
On top of a series or repairs, tweaks and snags the following major activity has been completed
View attachment 226176
All the fiddle yard wiring is completed so that's a major item off the list.
View attachment 226177
The final 'design' project was how to link the point and signal wires to the servos. This is now solved and the ones on the station board are in place and the servo boards just need programming
View attachment 226178
Needs a bit of tidying up but the principal is sound just need to complete the work on the other board
In answer to your question NigelAll fascinating stuff George! I’m intrigued by the bellcranks; from the photo they seem to pop up out of the top of the baseboard. Are they going to be hidden by the platform or a building or similar? Also the photo doesn’t show how the wires then link up to the points so a bit of explanation there would be interesting.
cheers
Nigel
Thanks Tony,It must take a bit of courage to exhibit an 'under construction' layout.
A hazard of living near the beach on the east coast. Up here (not very far from Workshop Wise) we’re used to summer days at about 13C with zero visibility when 200 yards inland they’re baking in 24C sunshine.I'm sure as long as something is moving around somewhere it'll be fine.
That backscene looks fine too - it kind of suggests represents fog or a sea haar
We ventured up to Holkham on a crystal clear sunny day in July, only to find the whole beach, and just the beach, totally fogged in - extraordinary.
It must take a bit of courage to exhibit an 'under construction' layout.
George,It was the night before workshop wise and all round the house could be heard the screaming at autofrogs....
Yes folks we have made it through the intense modeling period
View attachment 226322
One success was the installation of Johns signal all that needed was some extra cranks adding to the bottom for the control wires
View attachment 226323
As we were running out of time to install the fabric backscene @Liver & Fry has made a paper one that will serve for the show. Although it holds no tone or texture it helps create the effect I'm looking for and you start to see the scene coming to life.
View attachment 226324
Unfortunately 3 major faults have been found. The first we can live without fixing as it only isolates the home running line from use and is no great loss at this stage. We believe this is a dodgy servo motor to blame.
The other two issues are around frog polarity. I will be up early tomorrow sorting the the one I understand but the other we have two gauge master autofrogs not switching correctly. I've swapped them out for spares but to no effect and yet some on the layout are working correctly. I'm hoping out group DCC guru will let me use him as a sounding board before the show tomorrow.
View attachment 226325
So there we have it. I'm exhausted and frustrated not to have got the thing sorted in time for the deadline but also I only have myself to blame in setting myself the task in the first place. Once the weekend is over I need to take the time to find the joy in the hobby again.... As right now I'm not feeling it.
Now to bed!
Well done! The layout looks the part. And I’m hoping you’re giving yourself a well-deserved pat on the back.Ok so an update on today
So last night the layout wasn't working although a brainwave in the pub last night gave me hope of how I might be able to get the layout running. I blame the draft mango and lime cider. Very nice btw.
Well I've been awake since 2:30am.... Up since 5.... The problem with being on the organising team for an event is you worry how it will be revived... Particularly as this year Im responsible for all the layouts and demonstrators.... Deep breath..... But it gave me a chance to see if I could fix the layout....
View attachment 226389
Some last minute mods in the living room before it got packed in the car were in order basically I had made a mistake in assuming the cbus boards outputted a high when switched on so had wired the common for the relays to 0v actually when on they pulled low so i need to have the common at 12v (helpful merg documentation as usual, not). But once that was worked out the mods could be made
View attachment 226390
Not the prettiest but that little red wire makes all the difference. But at the time it was a good guess and I didn't have time to check the running before we left for stannington.
View attachment 226394
So that meant that the first test trains were run on Skeetsmere minutes before the show opened to the public.
And very surprising they worked, known issues like the rear siding and the servo that gives access to the front headshunt aside it worked really, unexpectedly, well. A few minor issues with rail joints, gauge on the exit curve and wagon couplings were found during the day but apart from that it was really uneventful.
Star of the show was #151 that performed flawlessly all day on its own without complaint, fault or issue. Given this poor loco had it's chassis split apart a year or so ago to convert to EM it runs remarkably well and I'm very proud of it.
View attachment 226395
From our point as an organising group it was a fantastic show. It was great to catch up with @Rob R and @Chris Veitch and many others and a special thanks to @Liver & Fry for all his support this week!
So I thought I would need to take a break from modelling after WW and was very prepared to have a long lie in this morning....but....
I woke up with a spring in my step determined to get into the workshop and get cracking
The operating department discovered yesterday that they were lacking suitable wagons so that's where I started.
View attachment 226487
So this is a rare beast and injection moulded kit for a GER diagram 55 17ft 7 plank open from Stelfox model engineering. You can tell by the plastic and the size of the sprue that this is a very old kit but I doubt many were made.
View attachment 226488
Saying that the mouldings are nice and it goes together well with a bit of fettling
View attachment 226489
Next my plan is to add some brass W irons instead if the plastic underframe supplied.
View attachment 226490
It's a nice product though and someone obviously spent a lot of time and money developing the tool so I wonder what happened to them and if they made anything more? Does anyone know any more background?