Mike Garwood
Western Thunderer
I could not continue with the bunker on a slant. So, I un-soldered the lot and started again. In cleaning up the castings I must have done something right, because the bunker is now square. Having got over this hurdle, it appeared to me that adding a lot of the small detail would be a good idea before soldering in the main parts. Things like handrails and the such. The downside of this is that I sent for etches to PPD nearly a week ago and apart from an acknowledgement of receipt...nothing. There are quite a few upgrades on this artwork including steps for the cab and mid footplate and steps that go on the front of the water tanks. Bearing in mind there is a time constraint involved (the painting countdown has begun), getting these etches is a bit of a priority.

I glued the chimney on last night and deliberately over did it as you can see. I spread some Vaseline around the lower lip of the chimney, so that shouldn't prove too difficult to strip off. The rest will come off with with a fibre brush. The boiler and smokebox are just resting and not fitted as yet. The next step will be to fit even smaller detail - the lamp irons - from the Masokits range. Front, mid and bunker.
One of the problems that that has been really annoying has been the 0.5mm drills snapping when half way thru the process. Now I was hand drilling these and I'm now wondering if I should have used a high speed drill (Dremell) instead - thoughts? Adding the lamp irons will require drilling a number of small holes, before solder is applied.

I did try a fit of the chassis to the body now that the buffer beams are in, no problems found. Also the lovely etch that Justin has done for the rear windows of the bunker have also been trial fitted. This wasn't quite so easy, especially as I had been so stupid to solder in the large lump of WM that represents the coal bulk head...and it needed thinning to get the etch anywhere near the rear of the cab. Out with the P4 modelling file and before too long I had a nice fit. So that's where I am now.
I would like to know if I'm right about the drills, so please don't hold back.
Stay safe
Mike.

I glued the chimney on last night and deliberately over did it as you can see. I spread some Vaseline around the lower lip of the chimney, so that shouldn't prove too difficult to strip off. The rest will come off with with a fibre brush. The boiler and smokebox are just resting and not fitted as yet. The next step will be to fit even smaller detail - the lamp irons - from the Masokits range. Front, mid and bunker.
One of the problems that that has been really annoying has been the 0.5mm drills snapping when half way thru the process. Now I was hand drilling these and I'm now wondering if I should have used a high speed drill (Dremell) instead - thoughts? Adding the lamp irons will require drilling a number of small holes, before solder is applied.

I did try a fit of the chassis to the body now that the buffer beams are in, no problems found. Also the lovely etch that Justin has done for the rear windows of the bunker have also been trial fitted. This wasn't quite so easy, especially as I had been so stupid to solder in the large lump of WM that represents the coal bulk head...and it needed thinning to get the etch anywhere near the rear of the cab. Out with the P4 modelling file and before too long I had a nice fit. So that's where I am now.
I would like to know if I'm right about the drills, so please don't hold back.
Stay safe
Mike.
Sorted now and I'm waiting for PPD to confirm the manufacture.



