Major milestones this month.
For the first time since I started building Cheddar, some 11 years ago now, I’ve finally been able to put all of the 8 scenic boards up together. Cheddar is going to be making its exhibition debut at Wells this August as a work in progress and with under 6 months to go I needed to take stock of just how much left there is to do before it gets there!
The layout has been in various unheated garages for the last few years and it’s almost 6 years since anything last moved on it, way before ballasting and track painting started. So needless to say I wasn’t expecting a great deal especially as on retrieving the panel I noticed the din sockets were corroded and the box itself showing signs of mould!
So first things first, the trestles and supporting rails were erected in the dining room, fitting with about half an inch to spare. Yes I did check when I bought the house but don’t tell anyone! After that the boards were brought out one by one and erected on top and the panel plugged in and an engine plonked on. Power applied. Nothing, nada, no sausages at all. No surprises there really.
Then I tried all the turnouts. Plenty of encouraging noises from the tortoise motors but nothing moving. Well at least the point feeds were getting to the layout.
So I started cleaning the track. It had tarnished heavily and had a crust that needed serious attention from abrasive pads. No wonder nothing had moved. After a while though, I got the furthest (Wells end) board clean enough. A bit of power and the engine moved! After a hearty hurrah and a little jig of delight, I then worked my way up towards the other end (Axbridge) cleaning and testing. By the end of the week I’d got to the other end (yes it was
that dirty), and confirmed that all track sections had supplied power to the rails and that both cab controllers worked to each section. DCC is a pipe dream…
There’s still a long way to go though. Next step is to get each and every turnout working again, which will be a combination of cleaning out all the crud and scraping away the ballast which has welded everything solid.
A couple of track joins require attention at baseboard ends as steps are now evident, I guess due to the plywood plates at the edges swelling over the years.
Curiously, the scenery sections have opened up considerably across baseboard joints. These are on a mixture of extruded foam and paper-mache so I’m going to need to redress that, or blag that Cheddar gorge is a bit closer to the station…
But onwards! I can start my snagging list now and carry on knowing that power is restored. It’s a case of deciding what has to be done by August and what can be left for later. One thing I will need is the fiddle yards, so maybe that’ll be next.
Photos attached, warts and all.
In the longer term, Cheddar will be exhibited (when it’s ready) and I hope that it will have a permanent home in a temperature controlled room where I can avoid the problems caused by its storage.
The other highlight of the week came from a very helpful chap at Bristol Water who sent me the original 1920 drawings of the Water Works that was served by a private siding. But that’s another story.