7mm The Derby Line: Basford North

Dave Holt

Western Thunderer
The bridge girders look very impressive, Tony. I see you've overcome the slight problem by inserting an extra row of bricks under the cap stones.
In an previous photo of the prototype, I got the impression that there was central beam between the tracks of the GC main line. Was there and, if so, are you including a representation on the model?
Dave.
 

dibateg

Western Thunderer
Thank Dave - yes - the GC built most their girder bridges with separate spans for up and down lines. I miscalculated the width of the track bed, so I will see if I can squeeze a representation in.

Regards
Tony
 

dibateg

Western Thunderer
Point rodding has reached the signal box now, it took a bit of working out to take each rod to enter the box in the correct position on the lever frame to match with the lever number. I've run out of rodding now, but there are just five rods to take East under the Park Lane Bridge.
IMG_1303.JPG
 

LarryG

Western Thunderer
The appearance of 0 gauge track, particularly fine-scale, is soooo realistic. No trains are needed in post #427; The separation of ballasted running lines and ash and muck of the nearer line is a feast to the eye.
 

AJC

Western Thunderer
I really like the view under the bridge - the variation of ballast, cess, main line and sidings looks just right. The rodding is definitely well worth the effort, too.

Adam
 

dibateg

Western Thunderer
Thanks Adam -
I took inspiration from Paul Scott's Colwich Junction, Geoff Taylor assisted with a lot of the ground works. The rodding really adds to the infrastructure in this scale.

Regards
Tony
 
Top