Since last post in no particular order, granddaughter, work, look after wife, work, work, posting notice, college, look after wife, work, college, work, college, posting notice, work, house move on, finish college, look after wife, house move off, work, house move on, pack belongings, work, look after wife
= not a lot of modelling
However, the Spartan Bridge S&T dept have been busy of late wiring in the new box
It would seem that the PWay mob are in for it as the Super' has turned up and they're nowhere to be found
The control panel just needs the last three isolating switches wiring in then it's a wait for the 25 pin D sub connectors to get here. The Royal Hong Kong Bay Railway are running rather late with their freight service

Once the connectors are here then the panel wiring can be finished then attention can turn to finishing the layout wiring.