mickoo
Western Thunderer
The fat lady is warming up back stage (Tosca I believe).
Just a few small items to fit now, some will be post paint. Those that can be fitted are the three remaining linkages under the cab, two to the steam cock, sanding gear and the third to the rear damper.
Smoke box mid height lamp irons are in the post from LG so hopefully here soon, they'll probably be the last pieces fitted before I strip down and send to paint. The boiler feed pipework is just held with stiction and all will be removed for polishing and refitting post paint.
The valve gear is all fitted and run in. It was the LH side, the rear driver connecting rod bearing needed easing a little, all good now and runs nice and smoothly.
That only leaves the cab internals and backhead, the floor is still loose and removable, I'll keep it that way to aid interior painting and refit at the end. With a good tail wind and focused day at the bench tomorrow it should all get done, I'm planning on 10 or 12 hours but it'll more as likely be 15
Just a few small items to fit now, some will be post paint. Those that can be fitted are the three remaining linkages under the cab, two to the steam cock, sanding gear and the third to the rear damper.
Smoke box mid height lamp irons are in the post from LG so hopefully here soon, they'll probably be the last pieces fitted before I strip down and send to paint. The boiler feed pipework is just held with stiction and all will be removed for polishing and refitting post paint.
The valve gear is all fitted and run in. It was the LH side, the rear driver connecting rod bearing needed easing a little, all good now and runs nice and smoothly.
That only leaves the cab internals and backhead, the floor is still loose and removable, I'll keep it that way to aid interior painting and refit at the end. With a good tail wind and focused day at the bench tomorrow it should all get done, I'm planning on 10 or 12 hours but it'll more as likely be 15
Last edited: