The last show for now, the Newport O Gauge show on the 5th of April went well.
It was the first show with the fully fitted internal floors and a lot of the internal parts painted, although there is still lots to do.
View attachment 238163 View attachment 238164
Some of the main fabrications are now fixed in place, and again there is a lot more details that can now be fixed.
View attachment 238165 View attachment 238166
I have also downloaded a couple of welders and welding sets for the boiler shop just before the show - when these are painted and fixed in place I will have to find a way to do the cables.
View attachment 238167
The week before the show I acquired two of the new Dapol Austerities. These are excellent models with good sound systems. These will be weathered in time.
The week before I had also done further trials on engraving cobbles for around the point - I had not had chance to try these before the show as the boards were created up.
View attachment 238168
View attachment 238169
This have worked better than expected, there are just a few tweaks needed to the drawings to finalise these.
Now we have finished going to shows until October next year, I have taken the plunge to remove the last of the temporary wiring and basic plastic plugs. This was for all the track feeds - the new proper plugs and permanent wiring is now in place on the main board and it is progressing on the yard board.
View attachment 238170 View attachment 238171
This is just the first of a long list of jobs to turn the layout from a work in progress to a proper exhibition layout.
I am still putting the list together and will share it at some point, along with further updates.
Andy