7mm David Andrews E1 4-4-0

Lancastrian

Western Thunderer
Some more detail work.
20230116_190906.jpg
A length of brass rod drilled through to 0.9mm with a length of 0.9mm brass tube inserted, which has a length of 0.7mm brass tube in that, and finally a length of 0.5mm brass wire. The larger diameter rod had a hole drilled through of 0.9mm which the 0.9mm etc tube(s) went through to make a sturdy join when soldered up.

Ian
 

Lancastrian

Western Thunderer
Continued work from today.
Made a two outlet oil pot.
20230121_191316.jpg

Boiler assembly had another test fit after the addition of the firebox casting and pipework.
20230121_235540.jpg

A close-up of the firebox fittings. The hole in the spectacle plate for the small pipe had to be drilled. There are more which were required for other pipe runs, which will become clear further in to the build.
20230121_235822.jpg

Ian
 

paulc

Western Thunderer
Modifications made to the frames to prevent the leading bogie wheels rubbing and not rotating on tight curves, following a similar alteration to the D1 4-4-0.

Scrap brass etch marked and filed to match the frame outline.
View attachment 176363

Frames after the halt etch "cut-outs" have been removed.
View attachment 176364

The brass inserts were then soldered in place on the inside of the frames.
View attachment 176365

A shot with the bogie in place.
View attachment 176366

The bogie pivot is a replacement item purchased from MOK.

Ian
Hi Ian , thats an interesting pivot , any chance of a picture showing how it and the bogie fit together ?
 

Lancastrian

Western Thunderer
The tender has progressed of late, slowly due to other projects.

Hateful tender flares which are separate parts..
20230225_100342.jpg

Frames and replacement turned buffers fitted.
20230312_002652(0).jpg20230312_002635.jpg

I've also replaced the cast whitemetal tank filler body with a turned brass item.
20230313_165059.jpg

Etched parts for the lid, and the rear steps in place, which require a little cleaning up from using the RSU.
20230313_190649.jpg

Axleboxes were fitted this evening.
20230313_190542.jpg

Ian
 

Lancastrian

Western Thunderer
Steam reverser cylinders finally fitted. I had to turn and drill the ball for the bottom valve. Overall it is an improvement over the original whitemetal casting.
20230324_194536.jpg

Other tender work.
Modified buffer beam and steam heating pipe. Valve handle moved to the opposite side.

20230317_181140.jpg

Painting of the tender and frames has commenced too.

20230318_171355.jpg20230318_224817.jpg
20230318_224830.jpg

Ian
 
Last edited:
Top