2 Standards done and delivered, one to finish, in the meantime now we have some warm weather it's time to catch up with the paint jobs. 48559 is part way through the weathering treatment, which takes several days. I need to loose that tide mark where the streaking starts. A clean fireman is hiding behind that paper!
And this Thompson coach has been stripped for the 2nd time, it was numbered and weathered, but it wasn't right, the maroon was lumpy and the weathering too dark, and after a 2nd opinion to confirm my dissatisfaction, I carried out that ghastly task. I've think I'm going to give up on rattle cans and spray with cellulose in the future..
