Hmm, nearly a year later and Scruffs has been out twice and next weekend is at the Fareham show. For those that don't venture to the other place here are photos of the layout and what progress has happened since the layout appeared at its first show in March.
Colliery Screens - Cladding of the building is now complete though below the roof was not complete, up next is drawing and printing windows. Other detailing parts are to be added, and then a lot of paint.
Footpath, fencing and signs.
The foot crossing has had the fences added and some new figures have appeared which were painted by a younger member of the local railway club.
Signs were added from Monks gate models. Still need to added gates and finish painting the fencing.
Trees
The first trees were "planeted" today, they are Primo silver birches with a single Oak also included.
The coming week will see the layout packed up with a number of small jobs to finish before Friday.
Peter