28ten
Guv'nor
Easybuild 105
With the 25 delayed by cab research the next boxes on the bench will be an Easybuild 105.
the kit has been supplied without wheels and motor and appropriate Slaters items will be used in conjunction with a gearbox and delrin drive. general spec includes split axles on the non driven bogies as its a shame not to benefit from the plastic construction.
If anybody has any shots of the interior or the underframe i would love to see them..
With the 25 delayed by cab research the next boxes on the bench will be an Easybuild 105.
the kit has been supplied without wheels and motor and appropriate Slaters items will be used in conjunction with a gearbox and delrin drive. general spec includes split axles on the non driven bogies as its a shame not to benefit from the plastic construction.
If anybody has any shots of the interior or the underframe i would love to see them..