Marc Dobson
Western Thunderer
A bit of progress at long last. what started as a quick lock down project has been anything but.
First problem faced was the track or the lack of S7 chairs for points. I have gone back to rivet and soldering with cosmetic chairs as I can butcher chairs to fit. As sutch the first rail was build early this week and the rest will be under construction shortly.
Baseboards have had to be designed as nothing is standard size. all the ply is now cut and ready to go.
First problem faced was the track or the lack of S7 chairs for points. I have gone back to rivet and soldering with cosmetic chairs as I can butcher chairs to fit. As sutch the first rail was build early this week and the rest will be under construction shortly.
Baseboards have had to be designed as nothing is standard size. all the ply is now cut and ready to go.