So enough on the body work for now, i've also been working on the frames. I've opted for the removable brake gear as per the kit instructions, my only slight deviation is that I've soldered a 12Ba nut on the inside of the frame as I wasn't confident that the taped frame would last regular stripping of brake gear, it may not be needed but i'd rather have it than the headache of a stripped thread once painted!
Like
@dibateg I've opted to replace some of the punched rivet detail with brass rod as it really does alter the look of the brake gear.
@Rob Pulham has some excellent photos of Winston Churchill on Filckr and they've been invaluable for the bottom end build detail. he has kindly allowed me to use them here. The front stretched has etched ends and replacing them with rod makes it look a lot better and much more like this;
Once the brake gear was sorted I went onto fit the motor and gearbox which is a Maxon and ABC combined unit. I then found that there was no room for the width of the gearbox between the hornblocks and compensation arms. Cutting down the gear box is not an option so I followed the advice of
@Dikitriki and cut down the hornblocks and guides to allow room for the gear box and side play. I soldered on some .64mm square brass bar to ensure the compensation arms would not slip off;
A large void to accept the gearbox and everything still works as planned. You can also see the 12Ba nuts for the brake gear. Once inside the frames I found that if I set up the gearbox at 90 degrees the motor can was a tight fit in the frames, stopping side play! So I modified the spare motion bracket and with some brass wire mounted the motor at an angle that would fit inside the body well and allow side play;
So the frames are at the stage where they only need a few jobs to finish, Sand pipes, speedo and those iconic pipe runs! Again i've used Rob's photos to start running in the pipe work. I'm going for the untidy BR used effect
I need to separate the smaller pipes a little more but you get the idea. Crosshead lubrication is finished, as are the cylinder covers. The kit suggests scribing in the inspection panel in the cylinder casing so I thought i'd have a go as looking at 34051 it is an obvious detail;
Cylinder taps are all drilled to accept the copper pipe and once they're fitted that completes the scene here. Smoke deflector fitted with blue tack for effect only at the minute, it WON'T be wonky when finished
A couple of final shots to show progress, the finish line is close
Can't keep the brass shinny BTW, sorry
Mick