Taking quick advantage of the dining table being briefly clear post-Xmas dinner, I took the chance to get started on Aberystwyth (Vale of Rheidol), my next micro layout project. 009/EM gauges. Ikea Lack shelf, 110cm x 26cm.

Based on the former Carmarthen bay platforms at Aber after the VoR terminus was moved there in 1968. The platform face nearest the viewer will be standard gauge for DMUs and the odd loco-hauled passenger or parcels train. A signal box at the end of the platform will form a scenic break. The platform canopies are modified and extended Airfix kits of some vintage.

As the layout will use the same stock as Mynydd y Ddraig (based on Devils Bridge terminus ar the other end of the line), it's set firmly in the early-1970s BR blue era. The same 4-coach train length will apply, so in theory Aber could be connected with Mynydd via a double-ended fiddlestick and through trains run.
Yesterday's tasks were to finalise track positioning, platform widths and get the 2mm eva foam sheet trackbase down across the whole board, ready to get the track laid and wired up.
I also cut the ply display box parts out (apart from the entry/exit holes which will be done once the track is fixed down.



Based on the former Carmarthen bay platforms at Aber after the VoR terminus was moved there in 1968. The platform face nearest the viewer will be standard gauge for DMUs and the odd loco-hauled passenger or parcels train. A signal box at the end of the platform will form a scenic break. The platform canopies are modified and extended Airfix kits of some vintage.

As the layout will use the same stock as Mynydd y Ddraig (based on Devils Bridge terminus ar the other end of the line), it's set firmly in the early-1970s BR blue era. The same 4-coach train length will apply, so in theory Aber could be connected with Mynydd via a double-ended fiddlestick and through trains run.
Yesterday's tasks were to finalise track positioning, platform widths and get the 2mm eva foam sheet trackbase down across the whole board, ready to get the track laid and wired up.
I also cut the ply display box parts out (apart from the entry/exit holes which will be done once the track is fixed down.













