Buckjumper
Flying Squad
Well, here it begins; Graham has the track plan, and somewhere in between laying LNW metals and his own GW&GC lines he's foolishly agreed to knock out some rickety old GE sidings for me.
A couple of shunting Bucks and a handful of wagons - a loco coal or two, a high-sided open for ash disposal and a sand truck (sic!).
Scenery: Lots of clinkery ash ballast compacted to the rail tops, a timber coaling stage, a grounded coach for a messroom, a water crane and shallow ash pits, dilapidated housing, a pub, a viaduct face masquerading as a temporary backscene until Stage 2, three girder bridges, roads of cobbles mixed with setts and hoggin, and lots of puddles and slush mixed with the remnants of a light snow.
All in approx 10 - 12' or so by 30"...ish.
Elsewhere you'll find a Christmassy bit of nonsense alongside.
A couple of shunting Bucks and a handful of wagons - a loco coal or two, a high-sided open for ash disposal and a sand truck (sic!).
Scenery: Lots of clinkery ash ballast compacted to the rail tops, a timber coaling stage, a grounded coach for a messroom, a water crane and shallow ash pits, dilapidated housing, a pub, a viaduct face masquerading as a temporary backscene until Stage 2, three girder bridges, roads of cobbles mixed with setts and hoggin, and lots of puddles and slush mixed with the remnants of a light snow.
All in approx 10 - 12' or so by 30"...ish.
Elsewhere you'll find a Christmassy bit of nonsense alongside.