4mm Barnstaple Quay!

AdeMoore

Western Thunderer
You may have seen my Meldon Quarry that’s still WIP but the storage yard morphed into something scenic.
Storage was always planned under the narrow gauge rock face.
As you will no doubt be aware I dabble and am pretty slow at turning anything out!
Onwards.

214912B3-2399-43CE-9B2E-560945424402.jpeg

focus on the middle left of the above photo.
Below is based on that.

0439A86E-1D7B-473E-BFDA-862B0F5CE6AB.jpeg
Ignore the left track rising that’s the 2nd circuit from storage and will be running on what is the road bridge.
More prototype photos.
953FB965-BC83-4D7A-8CB2-703DDA7239B2.jpeg62C00BBC-88D5-4D69-824E-32ABBA3C6930.jpeg78A7EC1E-A5F7-429C-92AB-5DAE04351D21.jpeg
Building below left from the side is my representation above of in low relief that will be made to run back as fits the space.

8C9E15F9-0320-4197-A16C-71CBE3B246EE.jpeg

Below above the Raleigh woodwork furniture & joinery sign that big warehouse a representation of that will likely go in.

EB89A5BB-4B74-4392-A331-7E098EDE972E.jpeg



Next is a bit I could do with some help with, I have 2 storage tracks that run tight to the back of the baseboard that will be covered in.
Running around from Meldon on the next board is the narrow gauge yet to be finalised, on an upper level.
Below was the mock up of that, the minitrix is set to be a L&B loco. The height is set to be much lower.

FC6CAE3D-218F-4593-B88C-67532A599B31.jpeg
641E33D6-E1CD-4A28-B935-2B76DB02FD03.jpeg


Below is the tricky bit. The right line out of storage runs to the taw bridge with a point joining from the Meldon board.

39E57AB0-0543-4C31-B58A-0DDDFE84C8DE.jpeg
The outcrop needs to come further out if this even works. I was trying to avoid the usual tunnel mouths.

73DC6C37-A1A5-4601-85CF-E8B5D59F85FA.jpeg
FAC1910E-934E-45A1-9842-7F253CFB5842.jpeg
Reason for the girder construction needs forming.
Then I tried another mock up.
Tunnel mouths these are N gauge but you get the idea.

82ABAEAD-7E1A-47FB-B79A-F2CD1A6A44E6.jpeg

The design as below would probably need 4 tunnel mouths one I didn’t think of until seeing the below photo over the right hand line following the point so the outcrop comes a fair way out.
Not keen on so many tunnel mouths all looks a bit rabbit Warren style layout.

3DA8D651-768B-4631-B670-22EB1D5DDF8E.jpeg


So that’s the quandary, I hope it can work!
The narrow gauge is set to descend as the 00 rises to meet side by side and head across the bridge and once over (the opposite side the room) will arrive at Barnstaple Town Station.

Any pointers or discussion gratefully received.

Thanks

Ade
 

Attachments

  • 858E6446-C9C3-45DD-93B0-3BB689A00833.jpeg
    858E6446-C9C3-45DD-93B0-3BB689A00833.jpeg
    167.5 KB · Views: 2
Last edited:

AdeMoore

Western Thunderer
The hidden storage is considered it will be lift off sections how long they are yet to decide.

The embankment and outcrop I imagine to be fixed to the point of meeting the level ground for the L&B line maybe tiny bit higher so the L&B track can drop in with a hidden join. Plug in connectors will be needed underneath clear of the storage stock. Then I need an ingenious way to lift out those sections when dropped in.

I think if I can make it work the girder section idea will be the way to go.

It was based on this idea below by @Nearholmer.

914259D9-7439-42BE-B70F-3E002C70C176.png

I could even develop the idea of a halt on top the storage lines.
 
Last edited:
Top